Rhine Bridge near Oosterbeek

07-10-2010 No (railway) bridge too far for Bolidt

The double track section on the Rhine Bridge near Oosterbeek was completely renewed after it had become clear that its life span had expired. Rail infrastructure operator ProRail is always happy to leave such work to Bolidt. And with good reason. 750 metres of rail have been embedded ahead of schedule…

Download the entire PDF-Newsletter

Archives

Safed for later

Recently viewed

Bolidt home