Holland Bridge

25-01-2008 Ready faster, safer and cheaper

The renewal plan for the Holland Bridge has changed drastically. The work will now be done faster, safer and cheaper. Bolidt’s contribution to this is considerable. A Boligrip epoxy wearing course was chosen as the top surface instead of asphalt.

Download the entire PDF-Newsletter

Archives

Safed for later

Recently viewed

Bolidt home